Introduction Scientific Videos Testimonials FAQ's Aquifers
American Water Wells
Interpertation Technique Advantages Statistics Price Contact License Water Witching Drillers

Inc

Fallbrook


2014 around the end of the year.  Picture to come.

DeLuz  road Gerald received, 300 gpm.

Old well started to peter out.

**I believe the driller was, DeChenne.


Read Gerald’s email replys:

Tony,  The driller struck water where you said it was.  I think I've got lots of water at a higher depth than my neighbors wells.  By the way the driller is also a dowser and he did his trick and agreed that that was the place.  Of course his measurements also said the old well site had water.

Anyway I am very happy to have used your services and to have had things turn out so "well".  Thanks for all your efforts.
Jerry Duryee
De Luz, Calif.


Gerald Duryee

Fallbrook - De Luz area.

Aug 20, 2015  

  The new well is working "well".  I think I have a copy of the drilling report.  The driller found water at about 280 feet at over 300 gal per min.  The well as installed is easily capable of 100 gal per min.  The water is potable ( I have a lab report on that too).  The main problem is that the old irrigation pipe fittings have been breaking wherever there is stress in the fitting.  The 150 psi static pressure when the well motor is automatically shut off may be a bit to high.


P.S.  The rock that the drill brought up where the water was, was fractured like you said, coarse chips not fine ground granite.















…..............................................................

2015 July.  Pala Mesa Resort.

 200 gpm. Will be pump tested for final output.  Drilled between two wells that were petering out.

**Driller, Fain Drilling








Video



















..............................................................































**   The mentioned driller at each Testimonial is not a recommendation to his services.

It’s to let you know that all drillers have hit numerous successful water wells on

computer generated targets.  Do not let the dishonest drillers mislead/fool you.

Next well I predict around 300 to 500 GPM

Top Of Page